Loading

Conversion of a Production Hall, Steel Industry

At Outokumpu’s steel plant in Krefeld, an old production hall was converted for a new pickling line (finishing of steel sheets). The hall is approx. 470 m long, approx. 140 m wide and approx. 12 m high. All old installations including plant technology, floor slabs, pits, shafts and façades were dismantled; pickling pits, equipment bases and other elements were then rebuilt, including sheet pile walls, excavation and disposal of contaminated soil, pits made of underwater concrete and watertight concrete structures. For the new plant, substructures and service routes made of steel sections were installed, along with new shafts, floor slabs, energy-efficient façades and site offices. The plant technology and installations were completely renewed. The conversion took place in 2013–2014.

Conversion of a Production Hall, Steel Industry 1
Conversion of a Production Hall, Steel Industry 2
Conversion of a Production Hall, Steel Industry 3
← Malteser Germany New IKV Building – Phase 4, RWTH Aachen →