Herzogenrath Indoor Pool
The new indoor swimming pool in Herzogenrath sets new standards for sustainable aquatic architecture. Its distinctive timber construction, clean architectural lines, and expansive glazing combine architectural excellence with environmental responsibility. As one of the first indoor swimming pools designed for CO₂-neutral operation, the building integrates innovative timber architecture with a forward-thinking, fully electric energy concept based on heat pumps and photovoltaic systems – ensuring resource-efficient and energy-conscious operation.
HOAI work stages 6–8 carried out in cooperation with slangen+koenis